GreenStep City Best Practices Transportation

Living Streets
no. 11

Create a network of green complete streets that improves city quality of life and adds value to surrounding properties.
  Best Practice Action 4      [ 1 2 3 4 5 6 ]       [all actions]

Identify, prioritize and remedy complete streets gaps and lack of connectivity/safety within your road network by, for example, adding a bike route/lane, truck route, sidewalk or mid-block alley.

 
  • Community members may also find this publication, edited by Jay Walljasper of Minneapolis, useful: A Citizens Guide to Better Streets: How to Engage your Transportation Agency (Project for Public Space & American Association of Retired People: 2008).
  • Engaging community members is essential in identifying gaps and in helping make a place more welcoming and livable with pedestrian-friendly street changes. A walking audit (a simple, lightly structured amble of 60-90-minutes with a group of 5-35 people) unlocks many insights and inspires problem-solving that is both creative and grounded in real life. Contact the Mobility Options best practice advisor for assistance in doing a walking audit.
  • The walkable, tree-lined multi-way boulevard is a road design standard for reconfiguring strip mall parking to keep in front while adding trees and a continuous, inviting walkable environment with resulting benefits in retail sales.
  • MN Dept. of Transportation pedestrian and bicycling resources. Also see Designing for All Ages & Abilities: Contextual Guidance for High-Comfort Bicycle Facilities (National Association of City Transportation Officials: 2017).
  • The Dakota County Office of Planning did a gap analysis for the county in 2009, and scored each gap using the following categories: housing density-40 points, employment density-10, shopping density-10, distance to schools-10, density of households in poverty-5, traffic volume-5, average speed-5, number of lanes-5, connectivity (density of intersections)-5, transit access-5.
Remedy at least one complete street gap, including using alleys. Report green alley interventions under action 17.5
Inspect, evaluate, inventory and map your roadway network for complete streets insufficiencies and develop a prioritized transition plan and timeline for remedying the insufficiencies and gaps. Pay particular attention to multimodal conflict areas and transit connections to serve users and destinations.
Routinely budget complete streets improvements through roadway & bridge capital improvement & maintenance projects; show project cost-savings through innovative/collaborative efforts with other jurisdictions/stakeholders; address street corridor issues by infill, adding bridge liner (retail on a bridge to be rebuilt in a walkable corridor), etc.

Arlington

Date action report first entered:   11/30/2015
Date of last report update:   11/30/2015

Implementation details:
On November 5, 2015 and again on December 3, 2015, the Planning & Zoning Committee met with the Streets Committee to participate in a discussion of complete streets. Everyone participated in an activity to create a concept plan (map) for complete streets within the city. Some of the concepts considered were lighting, safety, trails, both pedestrian and bicycle, sidewalks, boulevard enhancements, etc. The information will be consolidated and shared with the groups as well as at a future City Council meeting.

Outcome measures/metrics:
The hope is to present a policy (with a request for formal action) at a future City Council Meeting.

            view file

For more information contact:
Cynthia Smith-Strack (Contractor)   |   cstrack@municipaldevelopmentgroup.com   |   507-964-2378

Partners:
Planning & Zoning Committee, Streets Committee, City Council

View All Arlington Actions

Maplewood

Date action report first entered:   03/22/2012
Date of last report update:   05/01/2015

Implementation details:
With the creation of Maplewoods complete streets program, titled the Living Streets program, road connectivity has greatly increased. The Living Streets program has increased the amount of trails in the city as well as increasing the access to those trails. The Bartelmy/Meyer area as well as the Arkwright Sunrise area were renovated under the living streets policy. This created areas of greatly improved traffic for all modes of transportation including linking sidewalks to existing sidewalks and trails. Within the living streets program, road shoulders are created to be as wide as bike lanes located in other areas. This allows for safer bike travel and trail connectivity. The Public Works Department and Parks department are also surveying the city as a whole to identify problem areas and identify priority corridors, such as the County Road B corridor. There were also many cost savings included with the implementation of these living streets policies including decreased maintenance costs with narrower roads and increased alternative vehicle travel which helps these types of projects to be regularly budgeted for.

Outcome measures/metrics:
Repairing broken trail gaps allows for greater safety and mobility for residents.

For more information contact:
Steve Love (City staff)   |   steve.love@maplewoodmn.gov   |   651-249-2404

View All Maplewood Actions

Marshall

Date action report first entered:   01/26/2016
Date of last report update:   01/27/2016

Implementation details:
In an effort to improve connectivity and safety for bicyclists and pedestrians, the City of Marshall has solicited public input and formed new partnerships to increase the number of bike lanes, miles off-street paved trails, and make connections between the other cites and regional parks. With assistance from the Southwest Regional Development Commission a Health Impact Assessment was conducted in 2015 which provided information about sidewalk and trail gas as well as problem intersections.

Outcome measures/metrics:
Main Street Reconstruction of twelve blocks of sidewalks 2016 – replacing deteriorated pedestrian sidewalks after MNDOT improvements of ADA ramps at all intersections in 2015. 12.73 miles of painted bike lanes with signs to improve drivers awareness of cyclists and provide designated cycling lanes. 14.34 miles of paved off-street bike trails to connect all major areas of the city. Reconstruction of Trails – Holy Redeemer & Avera. Unprecedented partnership between the City of Marshall, Lyon County, City of Lynd and Minnesota Department of Natural Resources to share financial resources and in-kind staff contributions to construct a paved off-highway trail to connect Marshall, Lynd and Camden State Park (14 miles completed in fall of 2015). Safe Routes to School Planning Grant 2016 application with the following partners: Marshall Middle School, West Side School, Marshall Area Christian School, Holy Redeemer, Park Side School.

            view file

For more information contact:
Ben Martig (City staff)   |   Ben.Martig@ci.marshall.mn.us   |   507-537-6760

Partners:
City of Marshall, City of Lynd, Minnesota Department of Natural Resources, Camden State Park Staff, Lyon County, Marshall Public Schools

View All Marshall Actions

Richfield

Date action report first entered:   02/19/2016
Date of last report update:   02/19/2016

Implementation details:
The City has adopted the Richfield Bicycle Master Plan, which inventories and maps existing facilities, infrastructure gaps, and details a capital improvements program. The City's Capital Improvement Budget/Plan programs funding for improvements consistent with the Comprehensive Plan, the Bicycle Master Plan, and the safe routes to school plan. Although the four freeways in the City pose significant challenges, the City built the following: A pedestrian bridge at 73rd St. over I-35W, 76 St. trail on north side of I-35W, and a pedestrian underpass of I-35W at 66 St.

Descriptive links: http://richfieldsweetstreets.org/bigpicture

For more information contact:
Jim Topitzhofer (City staff)   |   JTopitzhofer@richfieldmn.gov   |   612-861-9394

View All Richfield Actions

Saint Paul

Date action report first entered:   10/27/2014
Date of last report update:   10/27/2014

Implementation details:
The City’s current draft Bikeways Plan and the Complete Street Plans both identify where transportation connectivity gaps are in the City’s streets, road network, bikeways and walkways. In October 2014, the Mayor and City Council of Saint Paul has approved the dedicated of $42.5 million in investments to jumpstart key projects across the city, known as the 8-80 Vitality Fund. A significant portion of this funding is going to improve roads, bikeways and green spaces. More information on the Complete Streets can be found at http://www.stpaul.gov/completestreets More information on the draft Bikeways Plan can be found at: www.stpaul.gov/bikeplan

Descriptive links: http://www.stpaul.gov/completestreets

For more information contact:
Kurt Schultz (City staff)   |   kurt.schultz@ci.stpaul.mn.us   |   651-266-6590

View All Saint Paul Actions

Belle Plaine

Date action report first entered:   04/11/2018
Date of last report update:   04/11/2018
Year action initially completed:   2018
Action completed after joining GreenStep?   Yes

Implementation details:
The City has mapped existing trails and sidewalks, evaluated deficiencies and mapped future sidewalk and trail routes. A map of existing and future trails and sidewalks is available for review.The attached map is included in the 2040 Comp Plan update which analyzes walkability and system gaps. The transportation plan element of the comprehensive plan illustrates points of congestion and roadway gaps. The City, Scott County, TCMC, and MnDOT joined forces to design, plan, and construct Enterprise Drive overpass which functions as a second grade separated interchange with Hwy 169 and CSAH 3. Post construction analysis points to a decrease of miles traveled by local a local bussing company of 100 miles per school day and an estimated reduction of nearly 13 metric tons of CO2 per year.

            view file

For more information contact:
Laura Blue (City staff)   |   lblue@ci.belleplaine.mn.us   |   952-873-5553

View All Belle Plaine Actions

Cottage Grove

Date action report first entered:   01/31/2014

Implementation details:
Through pavement management the city adds both transportation and recreational trails to street corridors and open space. The city also enhances walk-ability and accessibility to neighborhoods through pavement management by adding sidewalk sections and segments in gap areas.

For more information contact:
Ryan Burfeind (City staff)   |   rburfeind@cottage-grove.org   |   651-458-2899

View All Cottage Grove Actions

Fergus Falls

Date action report first entered:   01/14/2016
Date of last report update:   01/14/2016

Implementation details:
The City of Fergus Falls has been addressing gaps in the road networks in a number of areas throughout the city. Almost one mile of a walking/biking path has been added along Cleveland Avenue to the end of the city limits. When Fir Avenue was being reconstructed, the driving lanes were narrowed to provide a wider area for pedestrians and bicycles. One of our residents donated land to the city and it was converted to Noyes Park and a walking/biking path was incorporated into this area. When the Tower Road and Bridge project was completed, a trail connection across the river and a truck route was established in this area.

For more information contact:
Len Taylor (City staff)   |   len.taylor@ci.fergus-falls.mn.us   |   218-332-5418

View All Fergus Falls Actions

Golden Valley

Date action report first entered:   04/25/2017
Date of last report update:   04/25/2017
Year action initially completed:   2016
Action completed after joining GreenStep?   Yes

Implementation details:
The City has remedied certain street gaps in accordance with its complete streets policy. A Bicycle and Pedestrian Task Force was assembled to assess routes and connectivity in Golden Valley and a bicycle and pedestrian section will be incorporated to the 2040 Comprehensive Plan expressing the City’s intent to facilitate multi-modal transportation. The City’s 2017-2021 Capital Improvement Plan budgets for $400,000 in sidewalk and trail system upgrades (Project # S-030). These upgrades will be identified in the Transportation Chapter of the 2040 Comprehensive Plan in order to provide greater mobility for non-motorized transportation within the City that is fully accessible for users of all physical abilities.

Descriptive links: http://weblink.ci.golden-valley.mn.us/Public/2/doc/565845/Page1.aspx

For more information contact:
Jeff Oliver (City staff)   |   joliver@goldenvalleymn.gov   |   (763)-593-8034

View All Golden Valley Actions

Isanti

Date action report first entered:   02/05/2016
Date of last report update:   02/05/2016

Implementation details:
The City has adopted a Pavement Management Plan to assess transportation corridors and also sidewalk and trails to open space. The City actively manages repairs to keep sidewalks in good condition for continued accessibility. The City has mapped out all of the City’s sidewalks, trails and bicycle lanes and have opened discussion on where more need to be planned for. This map is included in the comprehensive park plan.

Descriptive links: http://www.cityofisanti.us/govt/city-departments/city-engineer

For more information contact:
Josi Wood (City staff)   |   jwood@cityofisanti.us   |   763-444-5512

Partners:
Bolton & Menk, Inc

View All Isanti Actions

Sartell

Date action report first entered:   12/02/2015
Date of last report update:   12/02/2015

Implementation details:
The city has maps which depict all existing sidewalks and bike paths. The city uses these maps along with plans (Comprehensive Plan, Strategic Plan, Safe-Routes-To-School Plan-SRTS,) to plan for and connect gaps in the network. The city also has in its subdivision requirements (11-5-4) a sidewalk/trail must be provided on at least one side of every public or private street. As a growing city this requirement is crucial in preventing future gaps in the network. The city was recently awarded grant money through the Transportation Alternatives Program. Gaps in the sidewalk network were identified in the city's SRTS plan. These gaps formed the basis for the grant request. The city was successful in obtaining grant money for the request as a result over 1200feet of sidewalk will be created in an area adjacent to the Middle and Elementary Schools. This connection will result in increased safety for pedestrians and encourage students in the area to walk to and from school.

Outcome measures/metrics:
Increased number of trips for non-motorized users.

Descriptive links: http://www.sartellmn.com/Websites/sartellmn/images/parks_and_trails.pdf             view file

For more information contact:
Nate Keller (City staff)   |   nate.keller@sartellmn.com   |   320-258-7316

View All Sartell Actions

White Bear Lake

Date action report first entered:   03/25/2013

Implementation details:
Certain complete street gaps have been rememedied. The City has mapped out all sidewalks, bicycle lanes, and trails located in the City and has evaluated where they are needed. This map/plan is included in the Comprehensive Plan.

For more information contact:
Connie Taillon (City staff)   |   ctaillon@whitebearlake.org   |   651-429-8564

View All White Bear Lake Actions

Brainerd

Date action report first entered:   06/16/2014
Date of last report update:   05/18/2016

Implementation details:
The reconstruction of Willow Street, completed in September 2014, included approximately 1 mile of on street bike lanes.

For more information contact:
Mark Ostgarden (City staff)   |   mostgarden@ci.brainerd.mn.us   |   218-828-2309

View All Brainerd Actions

Crystal

Date action report first entered:   09/07/2016
Date of last report update:   09/07/2016

Implementation details:
As streets are being reconstructed, sidewalks are being installed on State Aid roads where they link parks, schools, retail areas and other amenities.

For more information contact:
Anne Norris (City staff)   |   Anne.Norris@crystalmn.gov   |   763-531-1140

View All Crystal Actions

Duluth

Date action report first entered:   06/03/2014
Date of last report update:   06/03/2014

Implementation details:
Added sidewalks and trees along Glenwood Street in the upper Lakeside neighborhood.

For more information contact:
Cindy Voigt (City staff)   |   cvoigt@Duluthmn.gov   |   218-730-5071

View All Duluth Actions

Eagan

Date action report first entered:   04/04/2011

Implementation details:
Not Complete Eagan approved a Community Transportation Trail System Policy December 13, 2004. The City also adopted a Trail Connection Policy in January 2011, which assists with remedying non complete trail segments. The City has also completed

Descriptive links: http://www.ci.eagan.mn.us/upload/images/comprehensive/2030%20Comprehensive%20Plan/Appendix%20C%20-%20Trail%20Policy_low.pdf             view file

For more information contact:
Mike Ridley (City staff)   |   mridley@cityofeagan.com   |   651/675-5650

View All Eagan Actions

Eden Prairie

Date action report first entered:   04/17/2014

Implementation details:
Eden Prairie and Hennepin County are working to develop a new Pedestrian and Bicycle Plan for the city. The goal of this plan is to make walking and biking for transportation and recreation in Eden Prairie safer, more inviting, and more comfortable, convenient and fun.

Outcome measures/metrics:
In 2013, the City received funding through the Hennepin County CIP Sidewalk Participation Program which is an effort by Hennepin County to fund sidewalk improvement projects that provide pedestrian safety at intersections, provide ADA compliant facilities, support local plans, and support the implementation of the Hennepin County Transportation Systems Plan including the Hennepin County Complete Streets Policy. Due to the high priority of the sidewalk improvement connecting existing sidewalks along Mitchell Road/Baker Road. The project was successful in receiving a grant award, and it was used to help fund the Mitchell Road/Baker Road (CSAH 60) Sidewalk Improvement. This improvement was needed to complete the sidewalk system along the west side of Mitchell Road/Baker Road between Martin Drive on the south and the westerly extension of Roberts Drive on the north. As a test project the City included 2 pervious sections of sidewalk along Mitchell Road. The City will determine how to utilize these segments as testing for future sidewalk improvements.

Descriptive links: http://www.edenprairiepedbikeplan.org/

For more information contact:
Tania Mahtani (City staff)   |   tmahtani@edenprairie.org   |   952-949-8413

Partners:
Hennepin County

View All Eden Prairie Actions

Edina

Date action report first entered:   09/09/2013

Implementation details:
The City continually plans for and funds a variety of bike lane and trail connections to further the goal of having an integrated bike and trail network. In 2012 the City began counting bikes and pedestrians to better plan and prioritize safety and network improvements. The PACS fund was approved by City Council in December of 2012 to fund projects that makes the community more walkable and bikeable, including improvements proposed in the City’s Comprehensive Plan, the City’s comprehensive Bicycle Transportation Plan and the City’s Active Routes to School Comprehensive Plan. Revenue for the PACS fund will be generated by a franchise fee ordinance that imposes a fee of $1.45/month on residential customers of Xcel Energy and $1.45/month on residential customers of CenterPoint Energy. There are higher franchise fees for commercial customers of both utilities. Those fees are $2.90/month, $9/month and $40/month, depending on the size of the customer. The revenue in the PACS fund will be used exclusively for specific improvements to the City’s non-motorized transportation network. The non-motorized transportation network includes sidewalks, trails, and other bicyclist-related facilities. Other possible costs the PACS fund would pay for include maintenance of current sidewalks, signage, lighting, pedestrian crossing signals and street striping. Additionally, Edina maintains updated Bicycle Facilities and Pedestrian Facilities maps and a Sidewalk Priority Plan. These plans were created to identify gaps in our non-motorized transportation system and to help plan their construction.

Outcome measures/metrics:
Over the last five years, the City has made alternative modes of transportation a more viable choice by significantly expanding our sidewalk network and by adding over 58 miles of bike lanes (27.2 miles in 2012 alone) throughout the City and making connections to other regional bike lanes and trails. Our new work plan states that our goal is to construct 2 miles of sidewalk and 5 miles of bike lanes annually for the next few years.

            view file

For more information contact:
Mark Nolan (City staff)   |   mnolan@edinamn.gov   |   (952)826-0322

View All Edina Actions

Elk River

Date action report first entered:   11/24/2010

Implementation details:
The Irving Avenue Project in 2007 added a new sidewalk along the reconstructed city street. The Highland Road project added a trail along a reconstructed street.

For more information contact:
Amanda Bednar (City staff)   |   ABednar@ElkRiverMN.gov   |   763-635-1068

View All Elk River Actions

Elko New Market

Date action report first entered:   12/28/2015
Date of last report update:   01/15/2016

Implementation details:
There are no gaps in the City's paved trail system at this time. This system connects cycling and pedestrian trails throughout the city and the Park Plan dictates that these connections continue to be made as trails are developed around area parks and lakes and as general property development occurs.

For more information contact:
Mark Nagel (City staff)   |   mnagel@ci.enm.mn.us   |   952-461-2777

View All Elko New Market Actions

La Prairie

Date action report first entered:   12/15/2015
Date of last report update:   01/08/2016

Implementation details:
12/15/2015 Remedied a street –trail gap by constructing an 11 ft trail, that is one mile long to accommodate pedestrian and bike traffic. The trail was constructed to provide connectivity to the larger Mesabi Trail system. Constructed a sidewalk to accommodate wheel chairs which leads to newly purchased handicapped playground equipment.1/8/2016

For more information contact:
Lynn O'Brien (Elected official)   |   laprcity@paulbunyan.net   |   218-326-8898

View All La Prairie Actions

Lauderdale

Date action report first entered:   04/06/2015
Date of last report update:   04/28/2015

Implementation details:
On Larpenteur Avenue (north side), between downtown Minneapolis and I-35E, there were two sections of missing sidewalks. One of the "missing links" was a four section block in Lauderdale. The City took advantage of the ~eight feet of right-of-way purchased from the adjacent homeowners by Ramsey County in the mid-1990's to design and install a sidewalk. The goal was to include plantings and lighting for aesthetics and traffic calming. The final design included pervious pavers, LED lighting, and plantings using the “Swedish Soil” concept to improve their survivability. This was accomplished by intense attention to detail during the engineering phase (Stantec) and cooperation from adjacent homeowners, who approved the necessary temporary construction easements.

            view file

For more information contact:
Heather Butkowski (City staff)   |   heather.butkowski@ci.lauderdale.mn.us   |   651-792-7657

View All Lauderdale Actions

New Hope

Date action report first entered:   04/01/2015
Date of last report update:   12/03/2018
Year action initially completed:   2018
Action completed after joining GreenStep?   Yes

Implementation details:
The city adopted a Complete Streets resolution in January of 2011 and applies the policy to reconstruction projects, when appropriate. Examples of streets that have been altered or will be altered to follow the complete streets philosophy include Boone Ave N & 49th Ave N, Xylon Ave N & 45th Ave N (2015), and 49th Ave N between Winnetka Ave and Boone Ave (2016). In 2018, the city received $16,052 from Hennepin County to fund a feasibility study on bike lanes along Boone Avenue North between 27th and 42nd avenues as well as $55,275 for the installation of the bike lanes. Additionally, three pedestrian bump-outs were installed at Northwood Park, Sonnesyn Elementary, and Robbinsdale Spanish Immersion as part of the project. The bump-outs are intended to improve safety for pedestrians crossing the street.

Descriptive links: https://www.ci.new-hope.mn.us/cms/one.aspx?portalid=9826709&pageid=11168672

For more information contact:
Jeff Alger (City staff)   |   jalger@ci.new-hope.mn.us   |   763-531-5119

Partners:
Hennepin County

View All New Hope Actions

Red Wing

Date action report first entered:   01/30/2013

Implementation details:
The City received a SHIP grant to create a "Share the Road" bike and pedestrian route along Levee Road.

For more information contact:
Paul Drotos (City staff)   |   paul.drotos@ci.red-wing.mn.us   |   651-410-6744

View All Red Wing Actions

Rochester

Date action report first entered:   08/01/2011

Implementation details:
Rochester has recently added bike lanes on West River Parkway, as well as in the process of adding lanes to 19th st. NW, and Highway 14.

For more information contact:
Jeff Ellerbusch (City staff)   |   ellerbusch.jeff@CO.OLMSTED.MN.US   |   507-328-7132

View All Rochester Actions

Roseville

Date action report first entered:   12/30/2014
Date of last report update:   02/11/2015

Implementation details:
The Twin Lakes project remedied street gaps by adding a walking path connecting both sides of the lakes.

For more information contact:
Ryan Johnson (City staff)   |   Ryan.johnson@cityofroseville.com   |   651-792-7049

View All Roseville Actions

Saint Anthony

Date action report first entered:   05/05/2011

Implementation details:
The City of St. Anthony has adopted a sidewalk plan. As part of ongoing street reconstruction programs, this plan is being implemented. This includes improving pedestrian access to Silverwood Park, the Northeast Diagonal Regional Trail,and the Minneapolis Grand Rounds. The City is improving the safety of students who walk to and from school.

Outcome measures/metrics:
Implementing the City's mission statement of being a walkable community.

For more information contact:
Jay Hartman (City staff)   |   jay.hartman@ci.saint-anthony.mn.us   |   612-782-3314

View All Saint Anthony Actions

Saint Cloud

Date action report first entered:   05/11/2011

Implementation details:
Each year the City of St. Cloud targets specific areas in the core neighborhoods to reconstruct and/or rehabilitate streets, curb and gutter, install/repair sidewalks, sanitary sewer, as well as water main and storm drain facilities. The total cost of Neighborhood Revitalization Projects ranges from approximately $2,000,000 to $4,000,000 every year. These projects are programmed in the Capital Improvement Program and comply with the Citys Sidewalk and Boulevard Use Policy.

Descriptive links: http://ci.stcloud.mn.us/Planning/CIP.aspx

For more information contact:
Liz Kramer (City staff)   |   elizabeth.kramer@ci.stcloud.mn.us   |   320-255-7226

View All Saint Cloud Actions

Moorhead pending

Date action report first entered:   12/03/2018
Date of last report update:   12/03/2018
Year action initially completed:   2016
Action completed after joining GreenStep?   Yes

Implementation details:
The MetroCOG Bicycle and Pedestrian Committee created a plan in 2016 to remedy gaps and insufficiencies in the bike and pedestrian network. In 2019, the city of Moorhead will remedy one of these gaps with a complete streets project on Center Avenue. This project will improve safety for all modes of transportation and will improve the aesthetics of the corridor. It will also increase connectivity and provide a route for riders from Fargo and the Red River trails to Highway 75 in Moorhead. The 2016 plan includes other projects that will remedy gaps in the future in Table 6.3 in the attached PDF.

Descriptive links: http://www.cityofmoorhead.com/departments/engineering/current-projects/center-ave-project             view file

For more information contact:
Dan Mahli (City staff)   |   dan.mahli@cityofmoorhead.com   |   218-299-5314

Partners:
MetroCOG

View All Moorhead Actions

Woodbury pending

Date action report first entered:   05/01/2013

Implementation details:
The City’s Environmental Advisory Commission is currently studying this issue. Along with doing research on what other cities have done, they have also created a survey intended to get public input on perceived bike/pedestrian gaps and connectivity regarding our roadway network. The survey is actively being promoted at various public events. A final report will be developed with a priority list of needed improvements.

For more information contact:
Jennifer McLoughlin (City staff)   |   jmcloughlin@ci.woodbury.mn.us   |   651-714-3522

View All Woodbury Actions

pending means a star rating has not yet been assigned to this city


 
greenstep advisor
David Larson, Landscape Architect, Office of Environmental Stewardship, MN Dept. of Transportation: 651/366-4637, david.larson@state.mn.us, http://www.dot.state.mn.us/planning/completestreets