Home   |   About   |   Best Practices   |   Steps 1-5   |   Recognition   |   All Cities   |   Ordinances   |  City log-in   |   Contact           Stay Connected
GreenStep City Best Practices Buildings and Lighting

Efficient Outdoor Lighting and Signals
no. 4

Improve the efficiency and quality of street lighting, traffic signals and outdoor public lighting.
  Best Practice Action 6      [ 1 2 3 4 5 6 7 8 ]       [all actions]

Relamp/improve exterior building lighting for city-owned buildings/facilities with energy efficient, Dark-Sky compliant lighting.

 
  • Dark-Sky compliant outdoor lighting resources, including fixtures, manufacturers and distributors, from the International Dark-Sky Association.
  • The Minnesota Division of Energy Resources operates the Guaranteed Energy Savings Program for cities to lock in verifiable ongoing energy savings through performance contracting of deep retrofits - including exterior and interior building lighting - without capital appropriations. GESP is most appropriate, as a rule of thumb, for situations including at least one of the following: city utility bills are around $150,000 or more; possible project cost is around $350,000 or more; city population is around 10,000 or more.
Address high energy use lighting first, such as any ice rinks/athletic fields, working with the local utility as appropriate. Report relamping of parking lots/ramps under action 4.7
Relamp/improve two-thirds of building/facility lighting.
Relamp/improve all building/facility lighting.

Eden Prairie

Date action report first entered:   09/13/2011

Implementation details:
All City buildings have been converted to LED.

View All Eden Prairie Actions

Hutchinson

Date action report first entered:   04/30/2015
Date of last report update:   04/30/2015

Implementation details:
Remove and replace existing Metal Halide and High Pressure Sodium wall packs with full cut-off LED wall packs. Performance has caused continued implementation of this LED technology at all City facilities.

Outcome measures/metrics:
Better color rendering for safety/security and improved efficiency of lighting that runs more than any lighting.

            view file

For more information contact:
John Paulson (City staff)   |   jpaulson@ci.hutchinson.mn.us   |   320-234-5682

View All Hutchinson Actions

Saint Cloud

Date action report first entered:   05/17/2017
Date of last report update:   05/17/2017
Year action initially completed:   2015
Action completed after joining GreenStep?   Yes

Implementation details:
Completed for all facilities as part of the Street Light Improvement Project.

For more information contact:
Tracy Hodel (City staff)   |   tracy.hodel@ci.stcloud.mn.us   |   3202557226

View All Saint Cloud Actions

Wyoming

Date action report first entered:   05/29/2018
Date of last report update:   05/29/2018
Year action initially completed:   2018
Action completed after joining GreenStep?   Yes

Implementation details:
a lighting audit was performed by Xcel energy and CCE on all city facilities. Once the audit was completed the city council authorized LED lighting in all city facilities including, the Wyoming library, Wyoming city hall, Wyoming fire department, Wyoming public works and Wyoming police department. All internal and outdoor lighting was replaced at all facilities.

Outcome measures/metrics:
Total installed costs of all lighting were $ 28,570.12. The city received a $6, 755.00 utility rebate from Xcel energy resulting in a final cost of $21,815.12. With the LED light conversion the city will save an annually amount of $4,982.03.

For more information contact:
Robb Linwood (City staff)   |   rlinwood@wyomingmn.org   |   651-462-0575

Partners:
Xcel energy, Center for Energy and Environment CCE

View All Wyoming Actions

Coon Rapids

Date action report first entered:   01/20/2015
Date of last report update:   01/20/2015

Implementation details:
Coon Rapids singed a Detailed Engineering Study Agreement with McKinstry in 2009 to complete a performance contract totaling over $800,000 for both electric and gas savings due to implemented Facility Improvement Measures in various city projects. Between 2010 and 2012, various projects were completed to achieve utility savings. Part of this included exterior building improvements through higher quality lighting that consumed less energy which decreased annual exterior lighting electrical consumption by 51%. These projects were completed at City Hall, Police Station, three Fire Stations and Public Works.

            view file

For more information contact:
Colleen Sinclair (City staff)   |   csinclair@coonrapidsmn.gov   |   763-767-6485

View All Coon Rapids Actions

Richfield

Date action report first entered:   02/19/2016
Date of last report update:   02/19/2016

Implementation details:
The City replaced standard Wall Pack fixtures on park buildings, a well house, and on the Ice Arena with Dark Sky compliant fixtures and LED bulbs.

For more information contact:
Jim Topitzhofer (City staff)   |   JTopitzhofer@richfieldmn.gov   |   612-861-9394

View All Richfield Actions

Austin

Date action report first entered:   05/08/2012

Implementation details:
When fixtures are replaced they are replaced with Dark Sky compliant fixtures (this is in progress)

For more information contact:
Janet Anderson (Elected official)   |   jkanderson@gofast.am   |   507-433-1081

Partners:
Engineering Department

View All Austin Actions

Bloomington

Date action report first entered:   01/22/2018
Date of last report update:   01/22/2018
Action completed after joining GreenStep?   No

Implementation details:
Existing exterior metal halide and HPS light fixtures on buildings and walkway bollards have been replaced with Dark Sky Compliant LED at the Civic Plaza and Public Health Buildings.

For more information contact:
Mary Hurliman (City staff)   |   mhurliman@BloomingtonMN.gov   |   952-563-8730

View All Bloomington Actions

Kasson

Date action report first entered:   05/13/2011

Implementation details:
In 2012, exterior buidling lighting on City Hall and the two parking lot lights replaced with LED Dark Sky compliance lights.

For more information contact:
Nancy Zaworski (City staff)   |   financedept@cityofkasson.com   |   507-634-6321

View All Kasson Actions

La Prairie

Date action report first entered:   12/15/2015
Date of last report update:   01/08/2016

Implementation details:
1/8/2015 installed 16 new street lights on a corridor street that is 1 mile long. The new lights are LED and “Dark Sky” compliant.

View All La Prairie Actions

New Brighton

Date action report first entered:   05/03/2016
Date of last report update:   05/04/2016

Implementation details:
All exterior wall pack lighting on the Public Safety Facility (Fire Station) have been replaced with LED. We have also retrofitted have the wash bay, oxygen room, and laundry room with LED's.

For more information contact:
Craig Schlichting (City staff)   |   craig.schlichting@newbrightonmn.gov   |   651-638-2056

View All New Brighton Actions

New Hope

Date action report first entered:   04/24/2015
Date of last report update:   04/24/2015

Implementation details:
Energy efficient lighting is used as often as possible. Dark-Sky lighting is not required, but generally used on all lights other than streetlights. In In 2015, the city installed two new energy-efficient LED fixtures on the south side of West Metro Fire Station #3.

For more information contact:
Jeff Alger (City staff)   |   jalger@ci.new-hope.mn.us   |   763-531-5119

View All New Hope Actions

Roseville

Date action report first entered:   12/30/2014
Date of last report update:   02/11/2015

Implementation details:
The city's LED Retrofit Four Year Plan (2013-2016) requires the use of energy efficient,Dark-Sky lighting when relamping or improving exterior lighting of city-owned buildings. Apprroximately 25% has been completed.

For more information contact:
Ryan Johnson (City staff)   |   Ryan.johnson@cityofroseville.com   |   651-792-7049

View All Roseville Actions

Saint Paul

Date action report first entered:   12/23/2014
Date of last report update:   12/23/2014

Implementation details:
Parking ramps lights have been replaced high pressure sodium lighting with fluorescent. At the Science Museum and RiverCentre ramps, there are automatic dimming lighting.

For more information contact:
Kurt Schultz (City staff)   |   kurt.schultz@ci.stpaul.mn.us   |   651-266-6590

View All Saint Paul Actions

Sauk Rapids

Date action report first entered:   03/03/2013

Implementation details:
The City replaced a box light in the fire station parking lot with a Dark-Sky compliant light.

For more information contact:
Marilyn Patterson (Community volunteer)   |   mpp03@charter.net   |   320-258-5300

View All Sauk Rapids Actions

Lexington pending

Date action report first entered:   08/21/2015
Date of last report update:   09/28/2015

Implementation details:
Working on get getting the city inside and outside light updated

Descriptive links: BP 4 Action 6

For more information contact:
Peggy McNamara (City staff)   |   pmlexington@comcast.net   |   763-784-2792

View All Lexington Actions

Saint Anthony pending

Date action report first entered:   05/05/2011

Implementation details:
The City has identified in the Facilty Assessment Report and has scheduled replacement of existing fixtures in accordance with the reports recommendations.

For more information contact:
Jay Hartman (City staff)   |   jay.hartman@ci.saint-anthony.mn.us   |   612-782-3314

View All Saint Anthony Actions

pending means a star rating has not yet been assigned to this city


 
greenstep advisor
Susan Zarling, Traffic Electrical Systems Engineer, MN Dept. of Transportation: 651/234-7052, susan.zarling@state.mn.us